pipe making line cpvc pipe machinery flexible pvc pipe making machines
Technical Parameters
(SIEMENS BEIDE motor,SIEMENS / SCHNEIDER Contactor / Relay ,GUOMAO reduce gearbox , ABB/DELTA inverter,OMRON temperature meter…)
PVC Pipe Diameter(mm) | 16-40mm dual pipe | 20-63mm dual pipe | 20-63mm | 75-200mm | 160-315 mm | 315-630 mm |
Extruder | SJZ51/105 | SJZ65/132 | SJZ51/105 | SJZ65/132 | SJZ80/156 | SJZ92/188 |
Extruder power (kw) | 18.5AC | 37AC | 18.5AC | 37AC | 55AC | 110DC |
linespeed (m/min) | 0.5-10 | 0.5-15 | 0.5-10 | 0.5-8 | 0.5-6 | 0.5-4 |
capacity (kg/h) | 120 | 250 | 80-120 | 180-250 | 280-350 | 500-600 |
Main Composition
- SJZ51/105 or SJZ65/132 Conical Twin Screw Extruder with automation feeding unit
- Double Pipe Die head and Mould
- Double Pipe Vacuum Calibration Tank
- Double Pipe Haul-off Unit
- Double Pipe Cutter Unit
- Double Pipe Stacker
- SHRL-300/600 Heat/Cooling Mixer Machine (Necessary Machine for PVC PIPE MACHINE)
- SWP-360 Crusher (Recycle)
- Printer
- Belling Machine
Certifications
Certification | Certified By | Certificate No. | Business Scope Expiry Dat | Expiry Date |
ISO 9001:2008 | Beijing Hangxie Certification Center Co., Ltd., CNAS | 03413Q21640R1M
| Design and Production of Single-Screw Plastic Extruders and Conical Twin-Screw Plastic Extruders | 17/Sep./2013 16/Sep./2016 |
CE | European Inspection and Certification Company S.A. | CN.CE.0680-10/10 | Plastic Extrusion Machinery & SJ-30, SJ-45, SJ-65, SJ-90, SJ-120, SJ-150, SJ-180, SJ-200, SJSZ-51/105, SJSZ-65/132, SJZS-80/156, SJSZ-92/188 | 29/Oct./2010 28/Oct./2015 |
TUV | TÜV Rheinland | 7467484_P+T | Production & Trade Assessment | 15/Jan./2014 14/Jan./2015 |
Main Product Lines Verification Report | TÜV Rheinland | 7467487_P+T | Main Product Lines Verification | 15/Jan./2014 14/Jan./2015 |
DEERMA - Trade Assurance Limit : US $153,000
1.100% Product quality protection
If the product quality does not meet the standards set in your contract, waimaotong.com will refund the covered amount of your payment.
2.100% On-time shipment protection
If your products are not shipped on time as per your contract, waimaotong.com will refund the cover amount of your payment.
3.100& Payment protection
If the supplier breaks the on-time shipment or product quality terms of your contract, waimaotong.com will refund the covered amount of your payment
Competitive Advantage (why chose us)
DEERMA- Since 2006, focus plastic machinery about 10 years !
ENGINEER- Over than 30 years plastic machinery experience!
WOERERS- 15 years extrusion machine production experience!
SALES – About 10 years export experience !
PARTNER – SIEMENS/ABB/GUOMAO… Top quality parts , machine quality is guaranteed!
With longtime exporting experience and abundant technical skills we can ensure you good follow-up service and perfect after-sales technical support !
Our Services
1.Our company will provide relevant information on various technology and business consulted by customers. If clients want to visit our company, we will offer all they need for convenience.
2.After cooperation, our company designs groundsill installation chart for water, electricity and gas of equipment basing on real condition and customers’ requirements and provides detail order list and matching manufacturer for reference for customer.
3.After equipment arrival, our company will arrange professional technicians to buyer's factory for installing machines and train workers till customers can operate independently and manufactures eligible product.
4.Deerma machinery will be responsible for changing broken parts within warranty and then provide parts only with pure cost.
FAQ
1. Quality Control Management
Is there quality control on all production lines? | Yes, all production lines have adequate quality control |
Do the QA/QC inspectors work independently from the production line? | Yes |
Who does the QC/QA Manager/Supervisor report to? | GM -- Mr. Yanzhong Li |
How many QA/QC inspectors in total? | 4 |
Number. of Employees in Each Production Line | Supervisor 1 No. of Operators 29 No. of In-line QC/QA 2 |
2.Supplier Management
Does the company have a supplier assessment procedure? | Yes |
Does the company have an updated list of approved suppliers? | Yes |
Does the company establish and implement a standard procedure for purchasing contract review and approval? | Yes, with written standard procedures |
Does the company keep its supplier assessment reports? | Yes, assessment reports are available for the last 1-3 years |
Are the company’s purchasing documents sufficient to ensure product safety control and their customers’ requirements? | Yes, the purchasing document includes all the information required |
Is there a procedure to conduct random product inspections after final packaging? | Yes, with clear standard and written inspection records |
3.After Sales Service
Is customer feedback, including complaints, clearly recorded and maintained? | Yes, with a standard feedback form and records |
Are there any clear procedures for handling customer complaints? | Yes, with clear procedures and written records |
Is there a closed-loop corrective action system in place? | Yes |
Can finished/packaged products be traced by lot identification to the appropriate raw material test reports? | Yes, with procedures to trace raw materials |
Is there a product alert and recall procedure? | No |
CHOOSE DEERMA , CHOOSE SATIFICATION
...